Installing a cleanout means cutting a space in a pipe and fitting a wye or tee to stup up to the surface with a cap, so the line can be inspected or cleaned in future. This was a 6" PVC about three feet down in Port Coquitlam. Primary drainage is shown above and to the left in perforated 4" PVC.
No comments:
Post a Comment