A closer look at the blowers and unistrut at the end of the now double row of venting, I built my first chain-link fence enclosure around the vent caps.
Showing posts with label cutting. Show all posts
Showing posts with label cutting. Show all posts
Friday, September 18, 2015
Boiler Room III
Labels:
b vent,
chain-link,
concrete,
coring,
cutting,
drilling,
fabrication
Monday, August 17, 2015
Thomas the Tank
Here's a concrete job I went to help with, removing Thomas. He weighs about 13500 pounds when full and maybe half that while empty. The boiler sits on two rails that were embedded in short concrete footings. Myself and three other guys broke it down and moved it on pallet jacks and manpower, through a sliding door in the corner with only about 6' of gap to work with, out to the parking lot for later towing. It was exciting!